What are the 2 Size Requirement for MARPOL line?
MARPOL Line Marpol Annex 1, Regulation 30.4.2 requires every oil tanker delivered after 1 June 1982, required to be provided with segregated ballast tanks or fitted with a crude oil…
MARPOL Line Marpol Annex 1, Regulation 30.4.2 requires every oil tanker delivered after 1 June 1982, required to be provided with segregated ballast tanks or fitted with a crude oil…
The small diameter line which is used to discharge the last part of the cargo from the ship is called as MARPOL line. As per MARPOL Annex 1, Regulation 30, "Every oil…